Construction starts on Pelješac Bridge to bypass Bosnian territory Neum Corridor for better connectivity.
Updated By: History Editorial Network (HEN)
Published: | Updated:
2 min read
Croatia marked a crucial milestone with the start of construction on the Pelješac Bridge. This ambitious infrastructure project aimed to provide a direct road connection between the southern parts of Croatia, effectively bypassing the Neum Corridor - a small strip of Bosnian territory along the Adriatic coast. By building the Pelješac Bridge, Croatia sought to enhance its transportation network, improve connectivity, and reduce travel time for locals and tourists traveling to and from the southern region. The project represented a significant investment in Croatia's infrastructure and was a testament to the country's commitment to modernizing its transportation system. #Croatia #PelješacBridge #InfrastructureDevelopment
Primary Reference: Pelješac Bridge - Wikipedia
Location : Croatia
Explore the Life Moments of Croatia | 